Questions & Responses Released to All Sellers
|
|
Buy #: 1076078_02
|
Question Deadline:
None
|
Question Count: 0
|
|
|
Buy #: 1076078_02
|
Question Deadline:
None
|
Question Count: 0
|
| The Buyer has not released any questions/responses to all Sellers for this Buy. |
|
|
Buy #: 1076078_01
|
Question Deadline:
None
|
Question Count: 1
|
|
|
Buy #: 1076078_01
|
Question Deadline:
None
|
Question Count: 1
|
|
Question Submitted:
Are there elevators to the cab?
Response Received:
Documentation/Reference:
Unfortunately there are not any elevators to the cab. Additional information about the site was given on the last response if more detail is needed about the location.
|
|
|
Buy #: 1076078
|
Question Deadline:
None
|
Question Count: 1
|
|
|
Buy #: 1076078
|
Question Deadline:
None
|
Question Count: 1
|
|
Question Submitted:
1) Will the contractor be responsible for the removal and disposal of the existing console along with the existing equipment? 2) Will the standard plexiglass covered writing surface be required? 3) Are there Currently any plumbing features needed to be considered? 4) Will features for a refrigerator, microwave, bookcases, or remote systems monitoring panels? 5) Will the console change out be an "out of service" or "in service" process? 6) Is the current control tower equipped with an elevator? 7) Will the contractor have to provide on-location storage for materials storage or will the Government provide receiving and storage? 8) Will there be any other aspect of the console removal and replacement project that the contractor will have to take into consideration such as floor covering replacement, millwork trimming, wall repair, and replacement of damaged ceiling tiles?
Response Received:
Documentation/Reference:
1) The government will be removing the ETVS, STARS, and FDIO equipment. ATC will coordinate with the FAA and NWS for them to come and remove their equipment. Base Communications Squadron will remove/re-install network ports (see attachment COMM Access Ports and Plumbing Spec). 2) Yes. We will be requesting glass, but if it’s not feasible Plexiglas will work. 3)Yes, on one of the cabinets there is a sink with a small water heater under the cabinet (See attachment: COMM Access Ports and Plumbing Specs). 4) Above the stairs is located a storage cabinet (approx. 3’x3’x2’). There are additional storage cabinets/counters adjacent the stairs. There is also a long power strip that runs along the top of those counters as well. There are remote monitoring panels that will need to be re-installed to the new consoles, which will be coordinated with RAWS and the FAA (see attachment: COMM Access Ports and Plumbing Specs). 5) The console change will be an out of service process. This shutdown will need to be coordinated pending shipping dates and current flying operations. 6) The tower is not equipped with an elevator. There are five floors prior to reaching the steps to access the tower cab. 7) I spoke with Building Manager for building 320 and there is a large heated bay that the contractor will be able to use to store the replacement consoles. 8) The base will be responsible for clearing the cab for installation but the contractor will still be responsible for any potential damages due to negligence.
|
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support