Question Submitted:
-Which Party Is Responsible for fueling the generators?
-How Many hours per day is generator expected to run?
Response Received:
This Requirement has been Descoped and negates the need for a response to the above questions. There is no longer an HVAC / Power requirement for the Tents.
|
Question Submitted:
5.1.1 All structures shall be Clear Span type or equivalent, which provide occupants a weather-proof environment. Structures must possess, at a minimum, a 70 MPH wind load rating, in accordance with International Building Code. Each structure shall be configured to provide two (2ea) hinged doors capable of being latched shut, one located at each end. Please explain what type of latch or provide better definition what you consider latch shut. Are you looking for sealed shut doors?
Response Received:
Through the normal operation of the door, a mechanism (latch closure) which allows for securing the door so it will not freely swing open shall be installed.
|
Question Submitted:
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges. Would there be a chance our equipment could be trapped onsite after the period of performance ends due to this paragraph 1.4.1.2? Or does this only apply to entering or exiting for service/repairs throughout the contract?
Response Received:
No, your equipment will not be trapped. This only applies to entering and exiting the Orchard Combat Training Center during the Period of Performance.
|
Question Submitted:
Can you please tell me what surface the structures will be installed on? Does the National Guard need floors installed with the tent rentals?
Response Received:
-Structures will be built on hard packed dirt traditionally used as a parking lot for excess vehicles.
-Floors will not be needed as part of this requirement.
|
![]() |
Buy #: 1096695
|
Question Deadline:
04/14/2022 11:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1096695
|
Question Deadline:
04/14/2022 11:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support