Questions & Responses Released to All Sellers
![]() |
Buy #: 1073894_10
|
Question Deadline:
09/22/2021 12:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894_10
|
Question Deadline:
09/22/2021 12:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
![]() |
Buy #: 1073894_09
|
Question Deadline:
09/22/2021 12:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894_09
|
Question Deadline:
09/22/2021 12:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
![]() |
Buy #: 1073894_08
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894_08
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
![]() |
Buy #: 1073894_07
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894_07
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
![]() |
Buy #: 1073894_06
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 1
|
![]() |
Buy #: 1073894_06
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 1
|
Question Submitted:
The asbestos plan/study included is not complete, for our analysis we would need the complete document. Will it be available?
Response Received:
Files titled "Asbestos_O&M_Plan" and "Asbestos_Plan_Building_25_Diagram" have been added to complete asbestos report.
|
![]() |
Buy #: 1073894_05
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894_05
|
Question Deadline:
08/24/2021 11:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
![]() |
Buy #: 1073894_04
|
Question Deadline:
08/19/2021 11:00 ET
|
Question Count: 2
|
![]() |
Buy #: 1073894_04
|
Question Deadline:
08/19/2021 11:00 ET
|
Question Count: 2
|
Question Submitted:
Are there previous floor humidity tests? Are they required? -What type of wire mesh is required in the ceiling of the SIPR room? -When will we have pictures of the roof available? What roofing system does it currently have installed? -Will all the furniture be removed before the commencement of the work? -Is all the chain-link fence to be replaced? -Is item 5.21 referring to one window?
Response Received:
-Are there previous floor humidity tests? Are they required?
No
-What type of wire mesh is required in the ceiling of the SIPR room?
- Reference to DoD Manual 5200.01, Volume 3 -When will we have pictures of the roof available? What roofing system does it currently have installed?
Pictures will be provided. The roof system currently installed is a foam system. The following deficiencies were noted on a recent inspection.
- Roof shall be power wash (4 GPM/3,000 PSI power wash machine recommended).
- Replace missing/loose roof drain dome strainer.
- Repair insulation cracks.
- Apply two (2) coatings of white elastomeric sealer (minimum 20 mils dry film thickness).
-Will all the furniture be removed before the commencement of the work?
Yes
-Is all the chain-link fence to be replaced?
Any corroded part of the fence line, to include mesh, bared-wire, posts, etc. Assume 320 line feet. Reference to specifications 32 31 13.53 -Is item 5.21 referring to one window?
Assume all windows. Details of refurbishing any glass, know, hinge, frame damaged and coating/paint.
|
Question Submitted:
Answering 650468, Are we to use the asbestos studies attached, or are we to do new asbestos studies? Even though the building was built in 1983 consultants would prefer to check for lead because of experience with other buildings. Are we to do lead studies? I mentioned allowance, since it is not known how much material is to be abated, we can include an allowance for the cost of abating different materials per square feet and this will cover all abatement
Response Received:
Conduct lead study to confirm. Use the provided asbestos study
|
![]() |
Buy #: 1073894_03
|
Question Deadline:
08/19/2021 11:00 ET
|
Question Count: 5
|
![]() |
Buy #: 1073894_03
|
Question Deadline:
08/19/2021 11:00 ET
|
Question Count: 5
|
Question Submitted:
1. Are the original or as-built drawings available? 2. Is a bid bond required? 3. Are Payment & Performance bonds required? 4. Will the building be occupied while construction is taking place? 5. Should municipal construction taxes and patent be considered for this proposal? 6. At the site visit, it was mentioned that bids were due August 13th. However, solicitation documents indicates bids are due tentatively for September 10th. Please clarify. 7. Based on the SOW, this is a Design-Build project. Would a set of approved construction drawings be required? 8. The POP for this project is said to be 180 calendar days. Is this amount of time after the LBP and ACM studies and mitigation/remediation works have concluded? 9. Because the cost of abatement will depend on the results of the studies, will an allowance be considered for this purpose or will it be worked as a Change Order to the contract?
Response Received:
1. Are the original or as-built drawings available? See attached blueprint
2. Is a bid bond required? Yes, 20% of offer amount
3. Are Payment & Performance bonds required? Required for awarded contractor and given 10 calendar days to secure them in order to begin performance.
2. Will the building be occupied while construction is taking place? Mostly not.
3. Should municipal construction taxes and patent be considered for this proposal? Yes
4. Based on the SOW, this is a Design-Build project. Would a set of approved construction drawings be required? Yes
5. The POP for this project is said to be 180 calendar days. Is this amount of time after the LBP and ACM studies and mitigation/remediation works have concluded? POP starts once the notice to proceed is granted which include the whole construction. Any request for extension need to be justified prior to be approve.
6. Because the cost of abatement will depend on the results of the studies, will an allowance be considered for this purpose or will it be worked as a Change Order to the contract? Attached are the asbestos studies. Building 25 is a federal facility built in 1983. All lead based paints were prohibited in the 1978. So it is considered that there is no LBP on this facility..
|
Question Submitted:
10. SOW item 5.2 (Building Exterior) • Remove and replace existing chain link fence. Will the entire fence be removed or only the chain link mesh? How many feet of fence need to be replaced? • Please specify quantity of wheel stops to be replaced. 11. SOW item 5.4(Building Exterior) • The existing roofing system was tested for presence of asbestos/lead? 12. SOW item 5.5 (HVAC) • Are the original mechanical drawings available? • Are there any specifics for the AHU and condensing units that are to be installed? • Please provide total number of existing units that will require maintenance. 13. SOW item 5.6 (Plumbing) • Are the original drawings of the latrine area available? • Please provide specifics for the bathroom fixtures that are to be replaced, ie: toilet flush valve, lavatory faucet, hand air dryer, etc). This information is crucial so that all interested bidders quote specifically based on the specific requirements. Providing this information will guarantee a fair bidding process. • Material and specifications for bathroom ceiling and new walls division? 14. SOW item 5.9 (Electrical) • Will Design-Build be required for addtional / impacted areas within SOW or do existing electrical installations need to be included as well? • Is there an existing underground grounding loop for the new lightning protection system to be connected? • Are cable drops and communication equipment required to be provided for this project or only the provision of empty boxes and conduits with fish wire? • For the five electrical panels mentioned in paragraph 5.9.2 , are they going to be replaced entirely or only the covers? • Which areas require occupancy sensors and dimming for lighting? • Area all switches and receptacles going to be replaced? 15. SOW item 5.10 (Lighting Protection) • Will the UL inspection, certification and label be required? 16. SOW item 5.11 (Communications) • Provide specifications for the LAN cable to be used. • Will new LAN drops be required within modified walls and new spaces only or will they need to be replaced elsewhere in the building? 17. SOW item 5.12 (Break Room) • Provide material specifications and dimensions for new kitchen cabinets and top. 18. SOW item 5.13 (Doors) • Interior doors and frames material? • Type of hardware required?
Response Received:
Due to the large number of questions and systems characters limitations, answers to these questions have been posted as an attachment for the benefit of all interested parties. Thank you.
|
Question Submitted:
Please confirm if is the Payment and Performance Bond requested with the bid.
Response Received:
Greetings, we would like to make a correction to a response given in regards to the requirement for Payment and Performance bonds. For the purpose of placing a valid offer, we would only require bid bonds covering 20% of the offer amount. We would only require Payment and performance bonds at the time that the business has been notified as the apparent low bidder. We apologize for any confusion this may have caused.
|
Question Submitted:
Are there lead and asbestos studies? To comply with item 5.1 of the SOW do we have to include an allowance?
Response Received:
Attached are the asbestos studies. Building 25 is a federal facility built in 1983. All lead based paints were prohibited in the 1978. So it is considered that there is no LBP on this facility. Thanks for inquiring.
|
Question Submitted:
Are there lead and asbestos studies? To comply with item 5.1 of the SOW do we have to include an allowance?
Response Received:
Attached are the asbestos studies. However the Contractor shall perform their own study. No lead study. Please, specify what type of allowance are you referring to. Thanks for inquiring.
|
![]() |
Buy #: 1073894_02
|
Question Deadline:
08/11/2021 11:00 ET
|
Question Count: 1
|
![]() |
Buy #: 1073894_02
|
Question Deadline:
08/11/2021 11:00 ET
|
Question Count: 1
|
Question Submitted:
Hi, we need submit Bid Bond? If yes, what is the percent.
Response Received:
Greetings, that is correct and it needs to be 20% of the bid amount. Regards
|
![]() |
Buy #: 1073894_01
|
Question Deadline:
08/11/2021 11:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894_01
|
Question Deadline:
08/11/2021 11:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
![]() |
Buy #: 1073894
|
Question Deadline:
08/11/2021 11:00 ET
|
Question Count: 0
|
![]() |
Buy #: 1073894
|
Question Deadline:
08/11/2021 11:00 ET
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.
For additional information, please contact: