Questions & Responses Released to All Sellers
![]() |
Buy #: 1073301
|
Question Deadline:
08/03/2021 12:00 ET
|
Question Count: 1
|
![]() |
Buy #: 1073301
|
Question Deadline:
08/03/2021 12:00 ET
|
Question Count: 1
|
Question Submitted:
Are a specific type of lights required? What is the run time for the generator per day? Are the buildings insulated? How high are the ceilings in the buildings? Are we going to be able to tie into existing duct work or are we boarding up a door? What is the desired temperature? Is setup on the units required of only delivery?
Response Received:
Are a specific type of lights required?
5.0 Specific Tasks: Each generator will have a minimum run-time of 18 hours, under full load, with one (1) full tank of fuel. The primary generator shall be sized to supply the required 120 volt, AC power to each structure, 24 hours a day, and 7 days a week for the duration of the contract. Lighting fixtures shall be of adequate size and light disbursement as to operate an office facility inside the structures.
No specific type of lights.
What is the run time for the generator per day?
5.0 Specific Tasks: Each generator will have a minimum run-time of 18 hours, under full load, with one (1) full tank of fuel. The primary generator shall be sized to supply the required 120 volt, AC power to each structure, 24 hours a day, and 7 days a week for the duration of the contract. Lighting fixtures shall be of adequate size and light disbursement as to operate an office facility inside the structures.
Are the buildings insulated?
The buildings are hard stand buildings with some insulation.
How high are the ceilings in the buildings?
The buildings are one story tall.
Are we going to be able to tie into existing duct work or are we boarding up a door?
There is an intake and output line for HVAC systems
What is the desired temperature?
5.13 Temperature: Each Heating Ventilation and Air Conditioning (HVAC) shall be sized in order to maintain a temperature, in each structure, between 68 and 75 degrees at all times. The contractor shall use a combination of properly sized HVAC units or tent liners to meet this requirement. The contractor shall account for the temperature of personnel and equipment operating within each structure when calculating the necessary equipment in order to meet the requirements of this Technical Instructions.
|
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support