Questions & Responses Released to All Sellers
![]() |
Buy #: 1062022_01
|
Question Deadline:
None
|
Question Count: 3
|
![]() |
Buy #: 1062022_01
|
Question Deadline:
None
|
Question Count: 3
|
Question Submitted:
1. Is this a once per year monitoring event or a quarterly monitoring event? 2. Can the project be completed over 2 consecutive days or is it required to be completed over 1 day?
Response Received:
1. annually
2. It is not required to be completed in one day, but no more than three.
|
Question Submitted:
Are noise dosimeters, air sampling pumps and calibrators provided or are we expected to bring all necessary equipment for sampling along with us?
Response Received:
That is required for IH Survey, not required for this Avionics SE Depot to
maintain facility. Site NOLA does monitor temperature, humidity, and ambient
pressure in OBOGS clean room with stationary devices.
|
Question Submitted:
I have a question regarding Part B, Task 3. My questions are in red below. I’m trying to understand the ventilation (supply) of the clean room. TASK 3 VENTILATION and AIR PRESSURE INSPECTION - Conduct a ventilation inspection to measure positive airflow rate, volume, and capture efficiency to determine if compliance is met with regulatory requirements. 1) Ventilation – Air Flow a. Measure Supply Air Flow using room size, the number of air changes per hour (ACH). Is a velocity meter acceptable for measuring the air flow? Or is a Balometer required? In other words, what type of supply ducts are we measuring and how many supply ducts are we measuring? How has this been measured in the past? i. The value required to meet ISO Class 8 requirements is 5-48 ACH 2) Air Pressure Differential a. Measure the pressure differential between the Clean Room (113) and the Support Room immediately outside the clean room (112). Does the clean room have a monometer already hooked up? Or do we need to provide a monometer? How has this been measured in the past? i. The Clean Room should have a positive pressure differential between rooms of not less than + 0.05 inches of water above ambient pressure. ii. A differential pressure of not less than 0.01 inches of water should exist between any enclosure within the clean room and any adjacent area of lesser clean requirements
Response Received:
Below are some excerpts from one of the IH surveys conducted on our clean area. They will need to bring everything with them for measuring.
The Clean Room is a single room, approximately 910 cubic feet in size. A work
bench is positioned at one end of the room. There is a single supply vent and no
return air vent. The ventilation has redundant HEPA filtration with HEPA and UV
filtration in the main supply line and a second HEPA filter in the supply vent to the
Clean Room. The components of ISO 14644-2 were performed:
Particle Count Test
Air Pressure Difference
Airflow
Particle Count Test
Particle counting was performed using a TSI P-Trak Particle Counter. Particle counting was performed in
representative areas within the Clean Room. All measurements were less than
the ISO Class 8 requirements for 0.5 micron, 1 micron and 5 micron particle size.
The ventilation system was in normal operation during the testing.
Air Pressure Difference
An Extech Differential Pressure Manometer, HD755 was used to
measure the pressure differential between the Clean Room and the support room
immediately outside the clean room. The measurements indicated a pressure
differential between these rooms as +0.05 inches of water.
Airflow
The supply airflow was measured using a TSI Accubalance Plus 8373. Supply air was measured during normal
operations at 109 cubic feet per minute. Using the room size, the number of air
changes per hour (ACH) was calculated at:
109 cfm x 60/910 ft3=7 ACH
This value is within the ISO Class 8 requirements (5-48 ACH).
Temperature/Relative Humidity
Temperature and Relative Humidity were measured during normal ventilation
system operation using a SPER Scientific Instrument. The temperature
measured during the survey was 70.1o F and Relative Humidity was 41%. Both
were within the ISO644 parameters.
|
![]() |
Buy #: 1062022
|
Question Deadline:
None
|
Question Count: 0
|
![]() |
Buy #: 1062022
|
Question Deadline:
None
|
Question Count: 0
|
The Buyer has not released any questions/responses to all Sellers for this Buy. |
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support
For additional information, please contact:
Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support