Question & Responses for Buy # 1070658_03

Questions & Responses Released to All Sellers
Buy #: 1070658_03
Question Deadline:  07/12/2021 15:00 ET
Question Count: 4
Buy #: 1070658_03
Question Deadline:  07/12/2021 15:00 ET
Question Count: 4
Question Submitted:
After observing the road conditions that give access to the site and the conditions and size of the site itself, I have the concern to know if you will allow the use of heavy equipment for demolition.
Response Received:
Yes, the contractor is responsible to execute means and methods of the contract.
Question Submitted:
1. Do we need any permission form “the Commission”? 2. Do we have to separate the concrete from the metal for its disposal? 3. Do we have to compact the ground and do a compaction test? 4. Can equipment be left in the project area during the weeks? 5. Do we have to do a truck cleaning station to mitigate road mud? 6. Is there an existing plan of the structure to identify the construction of the foundation?
Response Received:
1. Please provide clarification of what exactly do mean by “commission”. 2. Refer to the SOW. 3. Yes. 4. Yes. 5. Refer to the SOW / special instructions. 6. Not Available.
Question Submitted:
1. What type of material we should consider for the perimeters fence? 2. What would be the final finish grade of the project? 3. Can we use the same existing soil material? 4. What is the maximum weight support of the existing temporary bridge? 5. Does the project have water and electricity utilities?
Response Received:
1. The contractor is responsible to execute means and methods of the contract. 2. Adjacent ground elevation. 3. Refer to the SOW. 4. Not available. 5. Not available.
Question Submitted:
1. What type of material we should consider for the perimeters fence? 2. What would be the final finish grade of the project? 3. Can we use the same existing soil material? 4. What is the maximum weight support of the existing temporary bridge?
Response Received:
1. The contractor is responsible to execute means and methods of the contract. 2. Adjacent ground elevation. 3. Refer to the SOW. 4. Not available.
Buy #: 1070658_02
Question Deadline:  07/12/2021 15:00 ET
Question Count: 1
Buy #: 1070658_02
Question Deadline:  07/12/2021 15:00 ET
Question Count: 1
Question Submitted:
1. Can you provide a photo of the building? 2. Does the building have a concrete foundation or is the building on blocks? 3. Are the building walls constructed of block, concrete or wood? 4. Is the roof made of wood / shingles? 5. Is there a rooftop A/C? 6. Will the government disconnect the power, water, sewer and Internet fiber? 7. Is the building on level ground for equipment access 360 degrees? 8. Please provide a few foots of the building.
Response Received:
1. Not available. 2. Concrete. 3. Both, CMU and concrete. 4. Concrete slab. 5. Not available. 6. Contractor. 7. Yes. 8. Not available.
Buy #: 1070658_01
Question Deadline:  07/14/2021 11:00 ET
Question Count: 2
Buy #: 1070658_01
Question Deadline:  07/14/2021 11:00 ET
Question Count: 2
Question Submitted:
Is a bid bond required?
Response Received:
No.
Question Submitted:
To whom the information required for the site visit must be sent?
Response Received:
The documents required for base access must be sent to TSgt Danny Carrasquillo at danny.carrasquillo_neira.1@us.af.mil, Maj Rolando Perez at rolando.perez.9@us.af.mil, and Mr. Angel Solis at angel.solis.2@us.af.mil.
Buy #: 1070658
Question Deadline:  07/14/2021 11:00 ET
Question Count: 0
Buy #: 1070658
Question Deadline:  07/14/2021 11:00 ET
Question Count: 0
The Buyer has not released any questions/responses to all Sellers for this Buy.
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.

For additional information, please contact:

Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support