Question Submitted:
Is it possible to get an 3 or 4 day extension.
Response Received:
The Buy is being extended. Please list the best estimate of delivery time.
Question Submitted:
Hello could you please clear what is GFE? in previous posted bid there were numbers for quantity but now in most items there are GFE
Response Received:
GFE is government furnished equipment. Items are in house.
Buy #: 1120468_04
Question Deadline:  11/01/2022 16:00 ET
Question Count: 1
Buy #: 1120468_04
Question Deadline:  11/01/2022 16:00 ET
Question Count: 1
Question Submitted:
Is this a site survey/walkthrough or installation? What floor will the work take place? Please provide description of conference room furniture that is included in this project: Wood table, wood credenza, etc. Is this a new install or replacing existing equipment? Are electrical receptacles in place? Will the services provider need to uninstall existing equipment? Will the existing/old equipment need to be removed from site? (recycling required?) What is the purpose of the site survey? (Create a BOM, determine installation requirements) Will work to be performed during normal business hours or after hours. Product being installed: Vendor & SKU #. Attach BOM or paste below. Media device connection for Display? Mounting height: (Display/Speakers/APs/Projector) If displays will be installed on a desk/dresser (hospitality) please indicate if they will be secured. (Screwed into furniture) Wall Type: (Sheetrock, Concrete, Brick, etc.) If displays are being mounted on carts, please indicate: Will Modifications to the wall need to be completed prior to mounting? (Backing, support, etc.) Ceiling Type: (Drop Ceiling, Sheetrock, concrete, brick) Ceiling Height: Is there a lift onsite that will be accessible to the engineer if one is required? Estimated date of installation: Hours space is accessible for installation: Brief Description of work to be performed: Is IT staff available for testing and questions is needed? Cabling needed? Type? (CAT5, CAT6, Fiber) Number of Cable Runs? Are there existing pathways? If so, what are they? Size of existing conduit? Are J-Hooks, surface raceway, or conduit required? Average length of cable run? Mandatory Outdoor cable needed? Will firewalls be penetrated by cable runs? Who will supply Cable? Union Labor Required? Please list an overview of programming/ configuration required along with a summary of functionality: If you have any questions or require assistance, please contact your Account Manager.
Response Received:
All of the answers are included in the B023A suggested drawings. this is located on the basement floor with access through the ceiling.
Buy #: 1120468_03
Question Deadline:  10/24/2022 11:00 ET
Question Count: 2
Buy #: 1120468_03
Question Deadline:  10/24/2022 11:00 ET
Question Count: 2
Question Submitted:
Can you advise us the last item part numbers please advise MISCELOUS CONNECTORS AND SMALL PARTS
Response Received:
These aere the necessary connectors, plugs and hardware needed to mount and connect all of the equipment
Question Submitted:
Does this solicitation require a security clearance to perform the work?
Response Received:
This job does not require a security clearance.
Buy #: 1120468_02
Question Deadline:  10/19/2022 11:00 ET
Question Count: 0
Buy #: 1120468_02
Question Deadline:  10/19/2022 11:00 ET
Question Count: 0
The Buyer has not released any questions/responses to all Sellers for this Buy.
Buy #: 1120468_01
Question Deadline:  10/19/2022 11:00 ET
Question Count: 0
Buy #: 1120468_01
Question Deadline:  10/19/2022 11:00 ET
Question Count: 0
The Buyer has not released any questions/responses to all Sellers for this Buy.
Buy #: 1120468
Question Deadline:  10/19/2022 11:00 ET
Question Count: 1
Buy #: 1120468
Question Deadline:  10/19/2022 11:00 ET
Question Count: 1
Question Submitted:
Good Day Hope this email finds you well Does this project needs installation as well ? also advise on last line item MISCELOUS CONNECTORS AND SMALL PARTS Can you share part number for these and quantity required?
Response Received:
Yes, installation is required as is some demolition. The small parts includes the various connectors needed for each piece of equipment.
Unison Marketplace Process Help
Help and Training page which includes training videos, interactive help, and more. A link can also be found on the top right of every page, after log in.

For additional information, please contact:

Marketplace Support
Tel: (877) 933-3243
Contact Marketplace Support